| TITLE | REFERENCE | LAST UPDATE | STATUS |
| Preparation, test and installation of a Powering Interlock Controller | EDMS 850025 | 2015-09-30 | In Work |
| CIBU COMMISSIONING STEPS | EDMS 1400288 | 2014-07-21 | Released |
| General procedure of the commissioning of the electrical circuits of a sector | LHC-D-HCP-0001 | 2004-09-29 | Released |
| Individual system tests of the Powering Interlock Controller (IST) | LHC-CI-TP-0001 | 2020-08-25 | Released |
| MPS Aspects Of The Powering Interlock System Commissioning | LHC-OP-MPS-0005 | 2016-04-02 | Released |
| Interlock Tests Of a Powering Subsector Prior And After Connection Of The Power Cables To The DFB Leads | LHC-D-HCP-0002 | 2005-01-26 | Released |
| Validation of Redundant UPS Power Distribution for LHC Equipment Systems After EYETS | LHC-EO-TP-0002 | 2019-07-11 | Released |
| Access restrictions in LHC and SPS during LHC powering Phase II | LHC-OP-OSP-0016 | 2020-11-10 | Released |
| Failure scenarios of the Powering Interlock System | HCWG 040325 | 2004-03-31 | Released |
Circuits Procedure and Acceptance Criteria
| TITLE | REFERENCE | LAST UPDATE | STATUS |
| Parameters for LHC Superconducting Circuit Powering Tests | LHC-MPP-HCP-0103 v.2.1 | 2020-11-11 | Released |
| RB: Powering Procedure and Acceptance Criteria for the 13 kA Dipole Circuits | LHC-MPP-HCP-0001 v.6.0 | 2021-11-19 | Released |
| RQD/F: Test Procedure and Acceptance Criteria for the 13 kA Quadrupole (RQD-RQF) Circuits | LHC-MPP-HCP-0002 v.6.0 | 2021-12-02 | Released |
| IT: Test Procedure and Acceptance Criteria for the Inner Triplet Circuits in the LHC | LHC-MPP-HCP-0011 v.2.2 | 2021-01-15 | Released |
| IPQ: Test Procedure for the Individually Powered 4-6 kA Quadrupole-Circuits in the LHC Insertions | LHC-MPP-HCP-0009 v.3.2 | 2021-02-23 | Released |
| IPD: Test Procedure and Acceptance Criteria for the Separation Dipoles Circuits | LHC-MPP-HCP-0010 v.5.0 | 2021-11-19 | Released |
| 600A: Test Procedure and Acceptance Criteria for the 600 A Circuits | LHC-MPP-HCP-0003 v.5.4 | 2021-01-15 | Released |
| 80-120A: Test Procedure and Acceptance Criteria for the 80 A and 120 A Dipole Corrector Circuits | LHC-MPP-HCP-0005 v.4.2 | 2021-02-24 | Released |
| 60A: Test Procedure and Acceptance Criteria for the 60 A Circuits | LHC-MPP-HCP-0006 v.4.3 | 2021-02-23 | Released |
Additional Documentation
| TITLE | REFERENCE | LAST UPDATE | STATUS |
| UPS PIC Chain Supervision in PSEN [EN-EL] | ELG-ENSSYS-EF-0010 | 2015-10-26 | Released |
| Actions to be taken upon receiving a Warning Alarm from the LHC UPS System | LHC-EO-OP-0001 | 2015-08-05 | Released |
| Parameters for LHC Superconducting Circuit Powering Tests | LHC-MPP-HCP-0103 | 2023-03-01 | Released |