Reference Documents
TITLE | REFERENCE | LAST UPDATE | STATUS |
Interface Specification: Splitting and Thermoswitch Modules of the DFHX and DFHM of the SC Link Systems | DFH - Interface Specification | 2022-09-15 | DRAFT |
HL-LHC: Infrastructure
TITLE | REFERENCE | LAST UPDATE | STATUS |
Underground integration list | 3D Model - new HL-LHC galleries | 2022-10-04 | Released |
UR Integration Equipment Layout | UR Integration Equipment Layout | 2023-05-12 | In Work |
AREA INTEGRATION REPORT: Integration of UL14 / UL16 / UJ14 / UJ16 | LHC-L-ER-0006 | 2023-07-20 | Released |
AREA INTEGRATION REPORT: Integration of RR13 and RR17 Caverns | LHC-L-ER-0001 | 2023-07-20 | Released |
AREA INTEGRATION REPORT: Integration of UL557 | LHC-L-ER-0007 | 2024-04-12 | Released |
AREA INTEGRATION REPORT: Integration Report of USC55 | LHC-L-ER-0005 | 2023-12-05 | Released |
AREA INTEGRATION REPORT: Integration Report of UJ56 | LHC-L-ER-0009 | 2024-05-10 | Released |
AREA INTEGRATION REPORT: Integration of RR53 and RR57 service caverns | LHC-L-ER-0002 | 2023-05-12 | Released |
AREA INTEGRATION REPORT: Integration of RR73 and RR77 service caverns | LHC-L-ER-0013 | 2024-03-08 | Released |
Other Specifications
TITLE | REFERENCE | LAST UPDATE | STATUS |
HL-LHC - COOLING AND VENTILATION USERS' REQUIREMENTS FOR P1 AND P5 | HL-LHC Rack Specification | 2022-09-27 | DRAFT |