TITLEREFERENCELAST UPDATESTATUS
Preparation, test and installation of a Powering Interlock ControllerEDMS 8500252015-09-30In Work
CIBU COMMISSIONING STEPSEDMS 14002882014-07-21Released
General procedure of the commissioning of the electrical circuits of a sectorLHC-D-HCP-00012004-09-29Released
Individual system tests of the Powering Interlock Controller (IST)LHC-CI-TP-00012020-08-25Released
MPS Aspects Of The Powering Interlock System CommissioningLHC-OP-MPS-00052016-04-02Released
Interlock Tests Of a Powering Subsector Prior And After Connection Of The Power Cables To The DFB LeadsLHC-D-HCP-00022005-01-26Released
Validation of Redundant UPS Power Distribution for LHC Equipment Systems After EYETSLHC-EO-TP-00022019-07-11Released
Access restrictions in LHC and SPS during LHC powering Phase IILHC-OP-OSP-00162020-11-10Released
Failure scenarios of the Powering Interlock SystemHCWG 0403252004-03-31Released
ommissioning of the Hardware in the LHC Sectors:Interlock Tests of Powering Subsector Prior & After Connection of the Power Cables to DFB LeadsLHC-D-HCP-00022005-01-26Released

Circuits Procedure and Acceptance Criteria

TITLEREFERENCELAST UPDATESTATUS
Parameters for LHC Superconducting Circuit Powering TestsLHC-MPP-HCP-0103 v.2.12020-11-11Released
RB: Powering Procedure and Acceptance Criteria for the 13 kA Dipole CircuitsLHC-MPP-HCP-0001 v.6.02021-11-19Released
RQD/F: Test Procedure and Acceptance Criteria for the 13 kA Quadrupole (RQD-RQF) CircuitsLHC-MPP-HCP-0002 v.6.02021-12-02Released
IT: Test Procedure and Acceptance Criteria for the Inner Triplet Circuits in the LHCLHC-MPP-HCP-0011 v.2.22021-01-15Released
IPQ: Test Procedure for the Individually Powered 4-6 kA Quadrupole-Circuits in the LHC InsertionsLHC-MPP-HCP-0009 v.3.22021-02-23Released
IPD: Test Procedure and Acceptance Criteria for the Separation Dipoles CircuitsLHC-MPP-HCP-0010 v.5.02021-11-19Released
600A: Test Procedure and Acceptance Criteria for the 600 A CircuitsLHC-MPP-HCP-0003 v.5.42021-01-15Released
80-120A: Test Procedure and Acceptance Criteria for the 80 A and 120 A Dipole Corrector CircuitsLHC-MPP-HCP-0005 v.4.22021-02-24Released
60A: Test Procedure and Acceptance Criteria for the 60 A CircuitsLHC-MPP-HCP-0006 v.4.32021-02-23Released

Additional Documentation

TITLEREFERENCELAST UPDATESTATUS
UPS PIC Chain Supervision in PSEN [EN-EL]ELG-ENSSYS-EF-00102015-10-26Released
Actions to be taken upon receiving a Warning Alarm from the LHC UPS SystemLHC-EO-OP-00012015-08-05Released
Parameters for LHC Superconducting Circuit Powering TestsLHC-MPP-HCP-01032023-03-01Released