Second Generation of Power Interlock Controller (PICv2)

In order to meet the dependability objectives of the HL-LHC era, TE- MPE-MI needs to develop a second generation Powering Interlock Controller (PIC), which will both address architectural improvements and modifications of the LHC and HL-LHC magnet protection systems as well as guarantee the current dependability and maintainability of the magnet interlock system for the lifetime of the HL-LHC project.

Reference Documents

TITLEREFERENCELAST UPDATESTATUS
Project Proposal PIC V1.0 (Roadmap)ACC-PM-RM-0006 v.12016-02-18Cancelled
Project Proposal PIC V2.0 (Roadmap)ACC-PM-RM-0006 v.22021-04-22Engineering Check
Reaction time Study of a full industrial version of the PICPIC Reaction Time2021-04-04Released
Underground integration list3D Model – new HL-LHC galleries2022-10-04Released
Interface Specification: Splitting and Thermoswitch Modules of the DFHX and DFHM of the SC Link SystemsLHC-DFH-ES-0004 v.0.32022-09-15DRAFT
INNER TRIPLET INTERLOCK PANELINNER TRIPLET INTERLOCK PANEL2023-09-29RELEASED
EPC/CCE HL-LHC Inner Triplet Interlock PanelTechnical Presentation2022-10-28OBSOLETE
WP7 – Relocation of the Powering Interlock Controllers outside of the RRsLHC-CIP-EC-00072025-12-12Released
Reliability Study PICv2 based on Prototype 2Reliability Study2025-06-04In Work
PICv2 Interface Boards automatic testerEDMS 32793602025-03-24In Work
Layout version LS3 1.8 Changes to the mechanical layoutLHC-LJ-ER-0002 v2.02024-12-02Released
R2E-HL-LHC(60-120)A-10V Engineering Specification – Installation of 120A ConvertersR2E-HL-LHC120A-10V-Power-Converter2025-10-17In Work

Quality Assurance – Convention

TITLEREFERENCELAST UPDATESTATUS
Equipment Naming ConventionsLHC-PM-QA-2042006-05-24RELEASED
Naming of Electrical Circuits and Power Converters for: LHC Injection Lines, CNGSAB-PC-QA-00012007-02-26RELEASED
Description of QPS Signals in LHCLHC-DQ-ES-00032005-09-28RELEASED
Basic Syntactic Rules for Naming of LHC Entities and their Parameters for the CERN Control CentreLHC-C-QA-00012004-07-26RELEASED
Naming of LHC Entities and their Parameters for the CERN Control CentreLHC-C-QA-00022004-07-26RELEASED

Others

TITLEREFERENCELAST UPDATESTATUS
HL-LHC Signal Cabling Patch Panels – Patched Cables and Solutions – TE-MPEELG-CABLING-IS-00182025-08-19Engineering Check